Comprehensive  Ghana Oil and Gas news, information, updates, analysis


News in Brief

Daily oil production projected to reach 240,000 barrels

  • SOURCE: | qwesa2big
  • oil-rigMr. Michael Aryeetey, Chief Operating Officer of Ghana National Petroleum Corporation (GNPC) Exploration and Production Company Limited (Explorco) has projected that the country’s daily oil production is expected to reach 240,000 barrels by 2020 as this will be attained when the three oil fields would be at its apex production.

    Mr. Aryeetey speaking in Accra at the Seventh College of Basic and Applied Sciences, University of Ghana, Public Lecture confirmed that, “This is good news for all stakeholders including the people of Ghana. But this trend will not last if investment into the industry stalls, pace of exploration reduces, we do not find more oil and gas, and we do not commercialise our finds.”

    Mr. Aryeetey explained that currently about 50 per cent of the sedimentary basin offshore is open with very little activity; and that the Voltaian basin with a size of about 103,000 square kilometres, and currently undergoing some level of exploration, led by GNPC.

    “Offshore Ghana still host a number of stranded or captured resources which cannot be commercialised on their own. It is important that going forward, all stakeholders come together and find ways through which these resources can be commercialized either together or in clusters,” he said.

    He said: Ghana’s oil reserves currently stand at 1.27 billion oil equivalent. This is relatively small compared to Nigeria’s 40 billion barrels of oil equivalent.

    “With almost 200 million barrels already produced, we must all work together to improve our replacement ratio by finding and developing more resources.”

    He said it was the expectation that even though oil prices generally continue the downward pressure in response to higher supply against lower demand, when the problem was resolved in the country’s favour, Ghana would continue to attract serious and well established oil companies who would work with GNPC and Explorco to ensure that an aggressive exploration and development activities in the basins were sustained.

    “This is key for us because increased exploration, development and production activities will lead to increased work load and demand for local participation and use of local goods and services,” Mr. Aryeetey said.

    The basin, Mr. Aryeetey said would be available for licensing to investors in the next two years or so, and that an increased industry activities in the country also present opportunities for improving infrastructure and facilitate continuous operations thereby ensuring that our government revenues are sustained and citizens remain in jobs to promote economic growth, he stated.

    The GNPC was established by the GNPC Law 1983 (PNDC Law 64), with the primary object of undertaking the exploration, development, production and disposal of petroleum.

    GNPC started operations in 1985. The Corporation is an anchor partner in all upstream operations and currently has stakes in 18 Petroleum Blocks and is the Operator of the Voltaian Basin. GNPC is also the National Gas Aggregator.

    Source: http://www.ghanaweb.com/GhanaHomePage/NewsArchive/Daily-oil-production-projected-to-reach-240-000-barrels-486929

    Leave a reply

    About Us
    Reporting Oil and Gas project was launched on 4th June 2009 at Takoradi, Western Region, Ghana by Penplusbytes (www.penplusbytes.org) with the vision of providing a one stop online information and knowledge about Ghana’s oil and gas sector read more
    Twitter Activity Stream
     

    Partners We are proud to be associated with:

    Skip to toolbar