Comprehensive  Ghana Oil and Gas news, information, updates, analysis


News in Brief

FPSO resumes gas production after shutdown

 

fpsoGas has begun flowing at the FPSO Kwame Nkrumah after a temporary shutdown yesterday due to faults on all Fire and Gas systems as well as VFD monitors on the facility.

The operators have since rectified the issue which has led to the activation of the Fire and Gas System of the facility hence the flow of gas.

Information available to Citi Business News indicates gas is flowing at 50 million standard cubic feet.

Citi Business News also understands all production, water injection and gas export stopped as a result of the issue.

Two TICO units are also reported to be on base load and are preparing to bring on the steam component.

Tullow says it will conduct investigations into the issue.

Meanwhile the Ameri power plant is expected to come on when gas increases above the 50 million standard cubic feet today.

Tullow however says it will conduct investigations into the matter.

Meanwhile no gas was detected on the facility for the incident and all personnel were accounted for as all of them reported to Muster Station, the information  further stated.

Implication of shutdown on dumsor

It is not clear whether this issue contributed to the extensive power outage that was experienced across the country on Tuesday.

Already, consumers are bearing the brunt of intermittent power outages which has been attributed to the shortfall in power generation.

This has also been attributed to a shortfall in gas supply from Atuabo Gas to the thermal plants at Aboadze.

Also, government is facing challenges transporting crude from Nigeria to Ghana to power the thermal plants.

FPSO repairs to cost

The turret bearing on the FPSO is damaged and the Jubilee Partners have disclosed that it will cost at least three hundred and forty five million dollars to fix the faulty turret.

Lead operator of the Jubilee field, Tullow was forced to shut down the vessel early this year and subsequently cut down production from the Jubilee field, after resuming operations this year, because of the faulty turret bearing on the FPSO Kwame Nkrumah.

Tullow Oil, earlier told Citi Business News it had cut production output from the field by over 50 percent to 33,000 barrels of crude oil per day as against the 100,000 per day it was producing prior to the shut down.

But in a trading Statement and Operational Update released last month, it said it expects average gross production at the jubilee field to be around 85,000 barrels of oil per day in the second half of 2016 following a number of new procedures it is currently rolling out to fix the turret issue.

Tullow has however revised its production guidance range to 62-68,000 barrels of oil per day.

source: citibusinessnews.com/Ghana

Profile photo of Editor
Follow Us

Editor

Reporting Oil and Gas project was launched on 4th June 2009atTakoradi, Western Region, Ghana by Penplusbytes (PPB – www.penplusbytes.org) with the vision of providing a one stop online information and knowledge about Ghana’s oil and gas sector
Profile photo of Editor
Follow Us

Share this article

Leave a reply

Personality of the Month
  • Prof. Thomas Mba Akabzaa Chief Director of Ministry of Petroleum          …
Follow Us Online
Join the Discussions

Summary: Revenue mobilization from the oil sector for Agricultural production in Ghana, a myth or reality?

Agriculture, once considered the backbone of Ghana’s economy recorded a reduction of its contribution to GDP from 45% in 1992…

Responses Add your response


About Us
Reporting Oil and Gas project was launched on 4th June 2009 at Takoradi, Western Region, Ghana by Penplusbytes (www.penplusbytes.org) with the vision of providing a one stop online information and knowledge about Ghana’s oil and gas sector read more
Events Calendar
<< Aug 2017 >>
MTWTFSS
31 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 1 2 3
Twitter Activity Stream
 

Partners We are proud to be associated with:

Skip to toolbar